图片名称

Performance Table of Water Treatment Equipment in Power Plant

Release time:

2020-09-04

NO.

Equipment name

Specification

Material

Quantity

Production years

 

User

Remarks

1

water for live

Q=600m3/h

Q235B

1

2007.8

Guiyang Power Plant1×125MW

 

2

Demineralized water system

3×125m3/h

Assembly

1

2007.8

Guiyang Power Plant1×125MW

 

3

Wastewater treatment system

Q=200m3/h

Q235B

1

2007.11

Jiangyou Power Plant2×300MW

 

4

Circulating water treatment system

Q=2000m3/h

Q235B

6

2007.11

Jiangyou Power Plant2×300MW

Valveless filter

5

water for live

Q=800m3/h

Q235B

1

2008.3

Xinjiang Shihezi Power Plant2×125MW

 

6

Demineralized water system

4×125m3/h

Assembly

1

2008.3

Xinjiang Shihezi Power Plant2×125MW

 

7

water for live

Q=200m3/h

Q235B

1

2008.6

Xinjiang Santai Power Plant2×50MW

 

8

Demineralized water system

2×60m3/h

Assembly

1

2008.6

Xinjiang Santai Power Plant2×50MW

 

9

water for live

Q=200m3/h

Q235B

1

2008.12

Xinjiang Baicheng Power Plant2×50MW

 

10

Demineralized water system

2×60m3/h

Assembly

1

2008.12

Xinjiang Baicheng Power Plant2×50MW

 

11

Wastewater treatment system

Q=100m3/h

Q235B

1

2009.6

Xinjiang Yili Power Plant2×125MW

 

12

Wastewater treatment system

Q=300m3/h

Q235B

1

2010.8

Xinjiang Manas Power Plant2×200MW

 

13

Circulating water treatment system

Q=1500m3/h

Q235B

4

2010.8

Xinjiang Manas Power Plant2×200MW

Integrated filter

14

Circulating water treatment system

Q=1200m3/h

Q235B

3

2010.8

Inner Mongolia Black Sea Power Plant2×125MW

Integrated filter

15

Water supply system

Q=1000m3/h

Q235B

6

2011.3

Inner Mongolia Dallas Power Plant2×300MW

Precipitation + filtration

16

Wastewater treatment system

Q=50m3/h

Q235B

1

2012.5

Inner Mongolia Jiagedas Power Plant 2×50MW

Acid-base neutralization, oily

 

17

Life processing device

Q=300m3/h

Q235B

1

2013.3

Inner Montoketo Power Plant

 

18

Coal-containing wastewater treatment device

Q=200m3/h

Q235B

1

2013.3

Inner Montoketo Power Plant

 

19

Automatic sand filter

Φ1600

Q235B

2

2014.4

Henan China Resources Power Plant Ancient City Co., Ltd.

 

20

Chlorine dioxide generator

Q=500g/h

Assembly

1

2014.4

Henan China Resources Power Plant Ancient City Co., Ltd.

 

21

Wastewater treatment system

Q=150m3/h

Q235B

1

2014.9

Urumqi Petrochemical General Plant Captive Power Plant

 

22

Glue ball cleaning device

Φ1200

Q235B

2

2010.10

Baotou Steel Thermal Power Plant2×125MW

Matching rotating filter

23

Glue ball cleaning device

Φ1200

Q235B

2

2012.1

Baotou Steel Thermal Power Plant2×125MW

Matching rotating filter

24

Coagulation reaction settler

Q=500m3/h

Steel concrete structure

2

2014.12

Wuxi West District Gas Thermal Power2×300MW

 

25

Air scrubbing filter

Q=300m3/h

Q235B

2

2014.12

Wuxi West District Gas Thermal Power2×300MW

 

26

Sludge treatment system

Concentration + centrifugal dehydration

Assembly

1

2014.12

Wuxi West District Gas Thermal Power2×300MW

Westfalia

27

Chemical water tank

V=1000、250、100m3

Q235B

6

2014.12

Wuxi West District Gas Thermal Power2×300MW

 

28

Ion exchange and activated carbon filtration

Φ3200、2500、1800

Q235B rubber lining

28

2014.12

Wuxi West District Gas Thermal Power2×300MW

 

29

Glue ball cleaning device

Φ1200

Q235B rubber lining

1

2014.12

Wuxi West District Gas Thermal Power2×300MW

 

30

Steel gate valve and opener

500×500

Cast iron with copper

4

2015.10

Wuxi West District Gas Thermal Power2×300MW

 

31

Water supply polyaluminum agent

Effective aluminum

10%

 

Perennial

2017.1

Wuxi West District Gas Thermal Power2×300MW

 

32

Raw water heating technical renovation project

Circulation

1000m3/h

Assembly

1

2018.8

Wuxi West District Gas Thermal Power2×300MW

 

33

Stainless steel grille

2600×2900,10×100

Stainless steel

2

2018.8

Wuxi East Asia (Power) Co., Ltd.

 

34

SCR denitration catalyst production line project for annual regeneration of 6000 cubic meters

Installation and commissioning of wastewater treatment equipment, process pipelines, and electrical devices

Assembly

1

2018.2

Shanxi Tongmei Electric Power Environmental Protection Technology Co., Ltd.

 

35

Wastewater treatment system

Q=8m3/h

Steel corrosion

1

2018.1

Shanxi Tongmei Electric Power Environmental Protection Technology Co., Ltd.

 

36

SCR denitration catalyst production line project with annual regeneration of 3000 m3

Wastewater treatment equipment transformation
Q=5m3/h

Assembly

1

2014.9

Shanxi Tongmei Electric Power Environmental Protection Technology Co., Ltd.

 

37

2×350MW supercritical low calorific value coal comprehensive utilization unit flue gas desulfurization wastewater project

Q=10m3/h

Assembly

1

2016.1

Shanxi Tongmei Electric Power Environmental Protection Technology Co., Ltd.

 

38

SCR denitration catalyst production line project for annual regeneration of 6000 cubic meters

Recycled pure water

Q=8m3/h

Assembly

1

2016.2

Shanxi Tongmei Electric Power Environmental Protection Technology Co., Ltd.

 

39

EPC project of flue gas desulfurization wastewater

Q=5m3/h

Assembly

1

2016.8

Shanxi Tongmei Electric Power Environmental Protection Technology Co., Ltd.